Launch campaign, Tuesday

So, now the launch campaign has officially started. All the teams have arrived, the “church” is really crowded and we do have a lack of chairs, power outlets and network connections. Not to mention that we are short of working space.

However it feels cosy and with the outside temperature it feels really nice to have enough people in here to keep the assembly hall warm.

We have conducted our last landing system test by putting the system it in a vacuum chamber and making sure that the pressure sensor and the oven cutter work in a proper way.This was done under time pressure, as there were still some things to be sorted out with the rocket service module and they found out that they needed us on the spot when we had just left for the test. On the other hand it was actually really tricky to find a feasible power outlet for the test because the building there is taken by the French from CNES and thus most of the power outlets there were french at the moment. Eventually the pressure test went really well and the top plate ejected as it should at the matching pressure for 5500 metres.

In the evening we prepared the SCALES with the flight cable and conducted a couple of tests in order to be sure they work.

Unfortunately Mikko and I were missing out on the sauna as we are accommodated in Kiruna and this means a one hour ride from Esrange. We almost had an accident with a reindeer instead.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: